Project Overview

HILL ROAD SUBDIVISION-POWDER SPRINGS, GA

HILL ROAD SUBDIVISION-POWDER SPRINGS, GA

The scope of this work at this large subdivision consisted of installing 6 inches of GAB base material, 2 inches of 19 mm asphalt binder, then 1.5 inches of 12 mm asphalt topping.

Additional work also included DOT de-cel lane paving with 10 inches of GAB base material, 4 inches of 25 mm asphalt binder, 2 inches of 19 mm asphalt binder, and 1.5 inches of

12.5 mm asphalt topping.

Project Gallery

Impressed by our work? Discover more of our standout projects

See All Projects

For inquiries, please reach out to Asphalt Enterprises, Inc.