The following pictures show a couple of projects completed in June of 2021:


The first few show us paving a very large office park in North Atlanta. Scope of work: profile milling down 3.5 inches, materials hauled off, then re-pave with 2 inches of 19mm asphalt binder and 1.5 inches of 9.5 mm asphalt topping.

Milling for each section was performed the night before, then areas paved the next day.

Total square yardage was over 30,000 sq.yds. and the job was completed in 6 days.


The next round of pictures show us placing the final layer of asphalt topping on a sub-division that we had previously rocked and placed the base course of asphalt (binder course).

New sub-division paving has become a huge part of our client base and is growing by leaps and bounds.