MONTVIEW ESTATES

Here is one of our paving crews placing the final 1,5 inches of 12.5 mm asphalt topping to a sub-division. Prior to this final layer, we installed 8 inches of GAB base material, fine graded and compacted,then placed 1.5 inches (compacted thickness) of 19 mm asphalt binder. Construction of some of the homes then took place, after which we were called to place the final layer of asphalt.