OAKWOOD TOWNHOMES - OAKWOOD, GA

Oakwood Townhomes is a beautiful new subdivision located just north of Atlanta, and we were proud to handle the paving work for one of our long-time, loyal clients. The project specifications called for 6 inches of GAB base material, followed by 2 inches of 19mm asphalt binder and 1.5 inches of 9.5mm asphalt topping.

Hydrated lime was incorporated into both asphalt layers during production. This modification offers several performance benefits, including:

  • Improved resistance to moisture damage and stripping—especially for moisture-sensitive aggregates
  • Reduced asphalt content in the design mix
  • Enhanced toughness and resistance to cracking at low temperatures
  • Slower age hardening of the asphalt binder (the liquid component that holds the mix together)
  • Greater mixture stability and long-term durability

If you're interested in learning whether a hydrated lime-modified mix could benefit your next project, contact one of our representatives to discuss cost-effective options tailored to your needs.

 

Project Gallery

Impressed by our work? Discover more of our standout projects

See All Projects

For inquiries, please reach out to Asphalt Enterprises, Inc.