Call for a Free Estimate 770-424-5001

Project Details

City of Atlanta

Asphalt Enterprises, Inc. is proud to have been involved in the construction and asphalt paving of 14 City of Atlanta Streets over the last year.  These streets are the first new streets that the city has constructed from scratch in over 20 years.  On this project we placed 3 inches of 25 mm SUPERPAVE, and 1 ½ inches of 9.5 mm SUPERPAVE over a prepared base.  The SUPERPAVE asphalt was modified with hydrated lime, to provide a stiffer asphalt that reduces moisture damage, improves toughness at low temperatures, and increases asphalt stability at higher temperatures.  Over 7000 tons of asphalt was used to complete these projects

See All Projects

Newsletter

Keep up with us through our email newsletter. You will receive valuable information on asphalt maintenance.

A PHP Error was encountered

Severity: Notice

Message: ob_get_clean(): failed to discard buffer of zlib output compression (0)

Filename: MX/Loader.php

Line Number: 370

Backtrace:

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 370
Function: ob_get_clean

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /home/asphalt/public_html/application/front-modules/projects/controllers/Projects.php
Line: 92
Function: view

File: /home/asphalt/public_html/index.php
Line: 340
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: ob_get_clean(): failed to delete buffer of zlib output compression (0)

Filename: MX/Loader.php

Line Number: 370

Backtrace:

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 370
Function: ob_get_clean

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /home/asphalt/public_html/application/front-modules/projects/controllers/Projects.php
Line: 92
Function: view

File: /home/asphalt/public_html/index.php
Line: 340
Function: require_once