Call for a Free Estimate 770-424-5001

Project Details

City of Atlanta - Street Resurfacing

This fall we completed the milling and resurfacing of 5 City of Atlanta streets.  The specifications called for a curb to curb milling of 1.5 - 2 inches, followed by an asphalt overlay of 1.5 inches of 9.5 mm SUPERPAVE asphalt, level II.  Traffic flow had to be maintained during the milling and paving of each street, which at times called for lane closures and the use of a pilot vehicle.  Over 4,500 tons of asphalt was used on these projects.

See All Projects

Newsletter

Keep up with us through our email newsletter. You will receive valuable information on asphalt maintenance.

A PHP Error was encountered

Severity: Notice

Message: ob_get_clean(): failed to discard buffer of zlib output compression (0)

Filename: MX/Loader.php

Line Number: 370

Backtrace:

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 370
Function: ob_get_clean

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /home/asphalt/public_html/application/front-modules/projects/controllers/Projects.php
Line: 92
Function: view

File: /home/asphalt/public_html/index.php
Line: 340
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: ob_get_clean(): failed to delete buffer of zlib output compression (0)

Filename: MX/Loader.php

Line Number: 370

Backtrace:

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 370
Function: ob_get_clean

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /home/asphalt/public_html/application/front-modules/projects/controllers/Projects.php
Line: 92
Function: view

File: /home/asphalt/public_html/index.php
Line: 340
Function: require_once