Project Overview

Emory Hospital - Midtown Atlanta

The scope of work on this project required us to remove and replace sections of concrete, full depth mill down 2 inches, then re-pave with 2 inches (compacted thickness) of 9.5mm asphalt topping. Unpaved areas were then sealcoated and striped with thermoplastic striping for longevity.

Milling was performed on a Friday night, then paving was completed by 1:00 pm the next day. 

Sealcoating was performed in sections the following Saturday and Sunday, followed by re-striping.