Emory Hospital - Midtown Atlanta

The scope of work on this project required us to remove and replace sections of concrete, full depth mill down 2 inches, then re-pave with 2 inches (compacted thickness) of 9.5mm asphalt topping. Unpaved areas were then sealcoated and striped with thermoplastic striping for longevity.

Milling was performed on a Friday night, then paving was completed by 1:00 pm the next day. 

Sealcoating was performed in sections the following Saturday and Sunday, followed by re-striping.

See All Projects

Newsletter

Keep up with us through our email newsletter. You will receive valuable information on asphalt maintenance.

A PHP Error was encountered

Severity: Notice

Message: ob_get_clean(): failed to discard buffer of zlib output compression (0)

Filename: MX/Loader.php

Line Number: 370

Backtrace:

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 370
Function: ob_get_clean

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /home/asphalt/public_html/application/front-modules/projects/controllers/Projects.php
Line: 92
Function: view

File: /home/asphalt/public_html/index.php
Line: 340
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: ob_get_clean(): failed to delete buffer of zlib output compression (0)

Filename: MX/Loader.php

Line Number: 370

Backtrace:

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 370
Function: ob_get_clean

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /home/asphalt/public_html/application/front-modules/projects/controllers/Projects.php
Line: 92
Function: view

File: /home/asphalt/public_html/index.php
Line: 340
Function: require_once