Call for a Free Estimate 770-424-5001

Project Details

5900 Windward Parkway/Deerfield Point

These 2 office parks, within a mile from each other were completed for a long time customer (a reoccurring theme here on our recent projects page) in April of 2018.  Projects consisted of approximately 17,000 lineal feet of cracksealing combined, along with approximately 58,000 square yards of sealcoating, then the re-striping of the properties.  We utilized both of our sealcoating crews, consisting of 10 men, a 1500 gallon truck mounted tank, and a 750 gallon trailer system.  The material was GemSeal PolyTar sealant, which is the most superior sealer on the market today, and is standard for all of our sealcoating projects.

See All Projects

Newsletter

Keep up with us through our email newsletter. You will receive valuable information on asphalt maintenance.

A PHP Error was encountered

Severity: Notice

Message: ob_get_clean(): failed to discard buffer of zlib output compression (0)

Filename: MX/Loader.php

Line Number: 370

Backtrace:

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 370
Function: ob_get_clean

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /home/asphalt/public_html/application/front-modules/projects/controllers/Projects.php
Line: 92
Function: view

File: /home/asphalt/public_html/index.php
Line: 340
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: ob_get_clean(): failed to delete buffer of zlib output compression (0)

Filename: MX/Loader.php

Line Number: 370

Backtrace:

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 370
Function: ob_get_clean

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /home/asphalt/public_html/application/front-modules/projects/controllers/Projects.php
Line: 92
Function: view

File: /home/asphalt/public_html/index.php
Line: 340
Function: require_once