Call for a Free Estimate 770-424-5001

Project Details

Cobb County DOT De-cel Lane

This is one of many de-cel lanes for our new construction projects. De-cel lanes are always heavy duty pavement, specified by the DOT, then monitored and inspected by DOT engineers. The specification on this job required 8 inches of GAB base material, followed by 4 inches of 25 mm asphalt binder, 2 inches of 19 mm asphalt binder, then 1½ inches of 9.5 asphalt topping.

See All Projects

Newsletter

Keep up with us through our email newsletter. You will receive valuable information on asphalt maintenance.

A PHP Error was encountered

Severity: Notice

Message: ob_get_clean(): failed to discard buffer of zlib output compression (0)

Filename: MX/Loader.php

Line Number: 370

Backtrace:

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 370
Function: ob_get_clean

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /home/asphalt/public_html/application/front-modules/projects/controllers/Projects.php
Line: 92
Function: view

File: /home/asphalt/public_html/index.php
Line: 340
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: ob_get_clean(): failed to delete buffer of zlib output compression (0)

Filename: MX/Loader.php

Line Number: 370

Backtrace:

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 370
Function: ob_get_clean

File: /home/asphalt/public_html/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /home/asphalt/public_html/application/front-modules/projects/controllers/Projects.php
Line: 92
Function: view

File: /home/asphalt/public_html/index.php
Line: 340
Function: require_once