Call for a Free Estimate 770-424-5001

Project Details

FRANK McCLARIN HIGH SCHOOL

Recently we were contracted to perform the paving at a new high school being constructed in East Point, GA, just south of Atlanta.  Specifications call for 6 inches of GAB base material, followed by 2 inches of 19 mm binder asphalt, then 1.5 inches of

9.5 inches of asphalt topping.  The following pictures show one of our base crews hard at work installing the GAB material, and a diagram of the property reflecting paved areas.   More pictures will follow as we progress with the paving process.

See All Projects

Newsletter

Keep up with us through our email newsletter. You will receive valuable information on asphalt maintenance.